We never expected this day to bring more than we ever expected. 

The digging machine was late. Nearly 9 AM and we had (we thought) not too much work for digging to do. The operator really was a specialist and did several things many times before. To make a soak away field the way we wanted it was his first time and he was really amazed. 

This man knows what working is and nothing we asked him was too much. So we completed the sewage system, dig holes/lanes for future electricity lines, completed the overflow system for the pond and made the holes for the foundation for the Knock Down Site office/house that will be delivered Monday 9 March. 

Phatsamon learned several new skills. One of them how to use the grinder to make five lanes of holes in the lower part of the sewage pipes. And... she made a wonderful lunch for the three of us at her mom's house. 

Because of a nice idea of a friend in Mae Rim we decided the septic tank only will be filled up by the toilet. The shower, washbasin,  kitchen sink and connection for the washing machine, pass the tank and flow directly in the pipe system of the soak away field. We made an inspection connection for the pipes and only the kitchen sink will get a so called grease trap to catch bigger components in that waste water and grease so the waste water will not disturb for ever the working of the soak away. The septic tank working organic. The special seed for it is already in and no chemicals will disturb the septic process in there. 

40 Degrees working temperature today. I think I drink around 10 liters of water (and after work at around 6 PM two big bottles of beer). Kadhow is more and more creative finding places to rest and cool down. In the evening and early morning being very active with digging in the sand we ordered and running as a puppy trough the field. 

Find some pictures of today again. 