Yesterday and today a truck with wall blocks came to deliver. Yesterday two pallets, today three. Because of the road conditions to our site the company decided to bring goods in small amounts so not too heavy for the truck to get stuck in soft soil or mud.
Still we have several trucks to go but this is already great so we can continue.
A second layer of Super Shield coating is at all walls and ceilings now,
We also finished for the second guest pyramid all the electricity. Outlets, switches, two wall fans, 18000 BTU airconditioning, emergency light incase of powerbreak, fire-alarm, bed lamps and wall- & ceiling lights. Everything working well.
The ceiling top mirrors are in (this time happy without breaking one) and the Feng Shui crystal is hanging in the center. Spreading nice rainbow pots in the sunlight.
Glass and mirror for the triangle cornerlight is placed and can be installed.
For now, weekend.
Frans Captijn