Friday, December 23, 2022

Big surprise and great delivery. The ground floor panels are in.

Unexpectedly at 6.15 AM this morning Phatsamon got a phone call. The two trucks from the CPAC-company in Saraburi (around 350 km away from our place / a four and a half hour single trip drive) arrived already. They left midnight from the company and took a short rest at a petrol station close to our place. 

A bit a surprise because we did not expect them so early but, soon we were ready after the dogs got their first but this time very short morning walk. So no yoga and meditation today.

The drivers did not want to start with coffee but with unloading and placing because the fresh and good weather to work. So, we did. 

The product we ordered (Hollow-core prefabricated prestressed floor slabs) is of a very high quality. Not possible to make this at location by yourself. Both drivers and crane operators were of the same great quality. Skilled in what and how to do and how to handle. 

So the first plank, out of 33, was placed at around 6.30 AM. The last already at 9.00 AM. A great job done with our compliments! 

Phatsamon and I, this time, were only helpers and guide ;). 

After the work the coffee for all and soon after the trucks were on their way to Saraburi again we walked a long time in the forest with our waiting dogs. 

















Frans Captijn