We are making a little progress again.
Because of some days of dry weather it was possible for a big truck to reach our site. So we got the second order of three pallets of rooftiles delivered.
After nearly two weeks our Kia truck is back from the garage. It took nearly two weeks for repair but, so far, it's driving (steering) fine. It gave us the possibility to buy another fifteen 2" x 4" steel beams for welding the basic construction for the second guest pyramid. Yesterday we also bought fifty battens already. Together with the remaining 'Q-Con' blocks enough materials for the next three till four weeks to go on with building.
In the mean time of the truck repair we worked inside the first guest pyramid to fit and fix all the basic electric pipes and wires. We checked and connected the main switchboard so we could close the straight walls. Last but not least we extended and completed our CCTV security system.
Frans Captijn