'Winter' is over. Temperatures during the day are around 38 degrees C. We need to slow down a bit and we do.
We finished the metal stud profiles and the 'Shera Splendid Cement Planks' are waiting to be installed. Block laying of the bathroom is on its way. Preparation of the sewage system as well. Tiling the roof is finished so the rooftop can be made. Monday a model of the glass rooftop will arrive.
Water and electricity main lines are prepared.
Next week we expect the excavator again and, a couple of days ago in the evening (because of working with the laser) we did the surveying of the second guest room for it. The digging machine maybe needs two days work to refill around the first room, prepare the place for the sprit house and dig the site for the second pyramid.