Tuesday, December 8, 2020

Hollow core slabs (basic floor for first guest pyramid) and water tank extension with pump arrived.

This morning, at the same time, the hollow core slabs as well as the 2 m3 tank extension with pump arrived. It took a little bit more than two hours to put the slabs in place and yes, although the truck had a crane, it still was a hard job. Phatsamon was of great help putting the heavy slabs in place. 

Yesterday we prepared the top of the masonry with a 1 cm thick layer of seconded foam. We put this layer to be sure during the rainy season no moisture will reach the floor and upper masonry. So actually the floor of the pyramid room is 'floating' on the foundation. This also helps to prevent against any cracking of walls and tiles.
We also installed all together five thin spray hoses to prevent us from pests under the floor.

Tomorrow I will finish the installation of the water tank and we will buy the first steel. 

Kadhow, was meditating at the labyrinth, knowing everything will be OK ;). 












Frans Captijn