Working on the top layer of the labyrinth is going very slow. Although I get more experienced in it the weather does not allow us to do about 1,5 - 2 m2 per day. It is the way it is. We just had to stop again because of a thunderstorm and cover the just poured gravel for a while to finish this gravel after the rain stops.
During the day is is very hot and humid. Temperatures till around 40 degrees C. Sweating (and drinking) a lot. So we work for a short while and stop again to have a short rest.
Although we will build only one of the two guest pyramids we got permission for, we do the preparations for water and electricity for both already. At the site we want electricity underground. We do not like concrete electricity poles and lines on the land. At the site we work with copper wires in special pipes connected with the site distribution station for electricity and water. For the water supply we make use of Thai Pipe 13.5 bar (high quality and thick) PVC.
Phatsamon and I are digging the trenches for the lines and water pipes. Really a hard job but... good additional exercise ;).
A small side distribution station with two electricity meters and a pit with two water meters are ready now and waiting for the connection with the main distribution station. For the building process we arranged a water and electricity connection close to the place where we start building the first guest pyramid room.
And again, during breakfast and work, several beautiful birds visit to have a look at the site or in the adjacent rice field.
Frans Captijn
e-mail: pyramidhousethailand@gmail.com
No comments:
Post a Comment