Two days ago we got a message in the afternoon the bamboo entrance gate for the labyrinth was already finished. So, although we wanted to start welding to create our veranda and sandwich roof we decided first to pick up the gate with our Kia truck.
Driving with it, it looked as if we started a business with a snackcar ;). But soon we were at our building site. Pity for us I found out the gate was much heavier than we thought. All around 250 kg. So it was not possible to get it from the truck (workers from the bamboo company put it on). We had to wait till this morning 6 AM for family help and... succeeded.
Another thing was I made a mistake with the foundation for it. So I needed to fix that. Happy to do it early this morning with lower temperatures. The thing, for us, looks great and the Lipstick palms have the shadow they need to grow as well now.
Yesterday and the day before yesterday we did do painting work (steel preparation and floor planks for the veranda) and last concrete pouring. A small foundation for the Buddha head statue West of the labyrinth and a foundation for the stairs to the veranda of the Knock Down Home. We also fixed some small things inside to make life even more comfortable.
This afternoon we will start with the preparation and first welding activities. First I will make the door for the power & water plant.
Find some pictures again.
Frans Captijn
e-mail: pyramidhousethailand@gmail.com
No comments:
Post a Comment