Sunday, February 23, 2025

Going on during already very high temperatures.

It took a short while to write this blog. Many things are not finished yet but we thought it's good to give an update about things going on at our construction site. 

First of all I could update my visa again for another year. That will be year number 13 in row I live here in Thailand. 

The last couple of weeks temperatures are rising quickly. A bit too quickly to be honest. Yesterday afternoon I had to stop working because I felt I was close to a heat stroke. 36 degrees C during the afternoon is 'normal' again. The next two months temperatures will only rise till far above 40 degrees C. So time to finish activities on the outside of the house before temperatures are too extreme to work and before the rainy season starts. 
Although it will not be ready we intent to start to use the house half of July this year. 

End of the year we hope to install the outside stairs and sun shields. Maybe earlier but we will see. 

At the moment we work on the inside and outside together. Where possible Phatsamon inside and for me, so far, only if I want to have some change of activities. Then I help a bit with painting or work on electricity.

I am still going on with outside tiling. Placed more Dura-one flashing tape under the lowest tiles against water absorbing. Tiling only is possible in the late afternoon now so the glue has time to dry in the night. We use the old bamboo mats to protect the next day against direct sunlight. 
Also joint filling, after all the tiles are in, needs to be done in the late afternoon and evening because the high temperature. 

So, Phatsamon is doing the preparation work of painting, the finishing touch we do later. We installed the Stiebel Eltron hot-water boiler. We bought already the base boards to install, and some wood. Be surprised. 

As many people know, wood is my favorite construction material but it's hard to use it with the amount of termites in our area. But inside (and or not connected with soil), we think and hope, it will not give a problem. So the time for wood is there. 

We are installing the ceiling of the meditation/yoga sala. Instead of the bamboo mats we ordered and could not use because of bamboo worms, we use special treated pine wood with an anti UV coating. 
The shirts you see hanging under the ceiling we use as scarecrow against interested birds who, during our activities, want to build a nest. 

Next week we hope the back sliding door will arrive. I have to do some concrete work for that. We also need to pour concrete for two outdoor air-conditioning units and for the generator and rain water storage tank. 

Indoor and outdoor ventilation units with mosquito screens as well as the stainless steel outdoor ventilation unit for the kitchen hood are in place already. 

A Hoopoe bird is using the shade of the sala roof to rest a bit. Dog Taffy is watching one of two paragliders interested in our work. 


























Frans & Phatsamon

Friday, January 24, 2025

Kitchen installed

As organized and scheduled Home Pro, the company were we ordered our Kitzcho kitchen furniture, even 15 minutes earlier than arranged, delivered at Thursday afternoon, January 23, 23 boxes of kitchen furniture to be installed today. We already stored three boxes (for the hood, the sink and the induction hob) so all together 26 boxes. 

Kitzcho offered us furniture of their 'Majestic' series. Solid (rubber tree) wood. 

At 8.10 AM three technicians from Kitzcho arrived already to start directly with their job. The marble plates were delivered at 10 AM this morning by two other staff members of the company.  

The flooring company still was working to polish and wax the indoor and outdoor floors. Happy they could arrange the place the kitchen needed to be installed was just ready on time. The delivered furniture had to wait at the veranda for one night. No problem in the dry season. We just put tarpaulins to cover and protect. 

The kitchen, actually, is not 100% ready. Some marble has to be grinded and fixed. And I have to install the sink because the basic connections to the kitchen tap are not long enough. Tomorrow I will do this job. For the marble the kitchen company will send a marble grinder. 

Happy tomorrow a quiet day and clean up everything just before a double birthday. 

So, this Friday was a busy day with 13 workers running around. Actually with amazing results that makes us all happy. 

All? Indeed. Our dog 'children' like the cool new floors in the house and will certainly use them for their comfort.






Solid laminated rubber-tree wood.














'Helping' cement paws of Taffy and Baijka.












This year, January is a very expensive month (worth it). Thank you lovely Phatsamon and ABP pension fund for support ;). 


Frans & Phatsamon